Ataköy Advanced Biological Waste Water Treatment Plant

Established on an area of 430.000 square meters, the plant removes carbon, nitrogen, and phosphor from the waste water of a population of 2.500.000 with a capacity of 460.000 cubic meters/day. In addition to this, it also allows using solid wastes for cement production by generating electricity from the emitted biogas.

Project Details

Acting as the solution partner for 2 years in the construction of the plant, Betonsa established a project facility at the construction site, and supported successful completion of the plant with sulfate resistant concrete it produced.

Project Details

  • Total volume: 150.000 m3
  • Products used: C35/45 Sulfate Resistant Concrete
  • Contractor company: Lidya Yapı- Kalyon İnşaat Joint Project
  • Project Years: 2007 – 2009
  • Project type: Infrastructure
  • Project location: Ataköy
  • Ready-mixed concrete facility: Ataköy Project Facility