Infrastructure – Betonsa http://www.betonsa.com.tr/en Beton, Hazır Beton Mon, 05 Dec 2016 11:47:02 +0000 en-US hourly 1 https://wordpress.org/?v=4.7.2 Üsküdar – Çekmeköy Metro http://www.betonsa.com.tr/en/reference-projects/uskudar-cekmekoy-metro/ Mon, 11 Jan 2016 13:38:31 +0000 http://projects.digitalfabrika.com/betonsawp/?post_type=references&p=1016 Üsküdar – Çekmeköy Metro, the second metro line on the Anatolian Side, has a main line tunnel of 17 km.

Project Details

Üsküdar – Çekmeköy Metro, the second metro line on the Anatolian Side, has a main line tunnel of 17 km. Metro will transport 1.5 million people daily, and will travel between Üsküdar and Sancaktepe in 27 minutes. It will significantly reduce the traffic on the Anatolian Side, and the passengers will save 33 minutes per journey. With the reduction in traffic, CO2 emission emitted to the atmosphere will decrease by 77 thousand 246 metric tons annually.

  • Total volume: 600.000 m3
  • Products used: Shotcrete, Pratikbeton, Viskobeton
  • Employer: Doğuş İnşaat Tic. ve A.Ş.
  • Project Years: 2012-
  • Project type: Infrastructure
  • Project location: Çekmeköy
  • Ready-mixed concrete facility: Project facilities: Çekmeköy Project Facility
]]>
Yavuz Sultan Selim Bridge http://www.betonsa.com.tr/en/reference-projects/yavuz-sultan-selim-bridge/ Fri, 16 Oct 2015 08:10:30 +0000 http://www.betonsa.com.tr/en/?post_type=references&p=7 3rd Bridge Project is the widest suspended bridge of the world with a width of 59 meters, and is the longest suspended bridge with rail system of the world with a span of 1.408 meters, and also has the highest tower height with 322 meters.

Project Details

A devoted effort was provided during the construction of highest reinforced concrete with our project facilities established at four individual locations during the project, and with 100+Beton specially produced in our R&D laboratories for the 3rd Bridge. The project has been carried out without loss of day with a daily construction speed of 3 meters, and with the highest concrete pumping distance of Turkey. In addition to concrete production, a complete support has been provided to the project with the flake ice facilities, used for the first time commercially in Turkey, as well as cold and hot water units, sensitive weighing systems, automation system, and recycling units.

  • Total volume: 1 million m3
  • Products used: 100+Beton 200000 m3, other special products: 25000 m3
  • Employer: İçtaş – Astaldi Partnership
  • Project Years: 2013-
  • Project type: Infrastructure
  • Project location: Sarıyer-Beykoz
  • Ready-mixed concrete facility: Project facilities: Garipçe, Poyrazköy, Odayeri, Fenertepe
]]>
Ataköy Advanced Biological Waste Water Treatment Plant http://www.betonsa.com.tr/en/reference-projects/atakoy-advanced-biological-waste-water-treatment-plant/ Tue, 06 Oct 2015 11:11:26 +0000 http://www.betonsa.com.tr/en/?post_type=references&p=11 Established on an area of 430.000 square meters, the plant removes carbon, nitrogen, and phosphor from the waste water of a population of 2.500.000 with a capacity of 460.000 cubic meters/day. In addition to this, it also allows using solid wastes for cement production by generating electricity from the emitted biogas.

Project Details

Acting as the solution partner for 2 years in the construction of the plant, Betonsa established a project facility at the construction site, and supported successful completion of the plant with sulfate resistant concrete it produced.

Project Details

  • Total volume: 150.000 m3
  • Products used: C35/45 Sulfate Resistant Concrete
  • Contractor company: Lidya Yapı- Kalyon İnşaat Joint Project
  • Project Years: 2007 – 2009
  • Project type: Infrastructure
  • Project location: Ataköy
  • Ready-mixed concrete facility: Ataköy Project Facility
]]>
Samsun Eastern Advanced Biological Waste Water Treatment Plant http://www.betonsa.com.tr/en/reference-projects/samsun-eastern-advanced-biological-waste-water-treatment-plant/ Mon, 05 Oct 2015 13:30:46 +0000 http://www.betonsa.com.tr/en/?post_type=references&p=940 As the only treatment plant of the Black Sea Region, Samsun Eastern Advanced Biological Waste Water Treatment Plan has a waste water treatment and deep sea discharge plant with a capacity of 105.000 m3/day. Betonsa, Turkey’s most reliable and innovative concrete brand, has been preferred in this special project.

Project Details

  • Total volume: 61.000 m3
  • Products used: Sulfate Resistant C30 Concrete
  • Contractor Company: Pwt- Alke-Alkataş Partnership
  • Project Years: 2012-2014
  • Project type: Infrastructure Project
  • Project location: Samsun
  • Ready-mixed concrete facility: Çarşamba Ready-Mixed Concrete Facility
]]>
Samsun Ring Road Junction Viaduct http://www.betonsa.com.tr/en/reference-projects/samsun-ring-road-junction-viaduct/ Sun, 04 Oct 2015 13:22:34 +0000 http://www.betonsa.com.tr/en/?post_type=references&p=928 Self-compacting Viskobeton product has been used for the piers of viaduct in the Ring Road Junction Project, Europe’s second biggest viaduct on single abutment. With a height of 2.850 meters, viaduct is a project significantly relieving the traffic of Samsun.

Project Details

  • Total volume: 150.000 m3
  • Products used: C25 Viskobeton, C25 Standard Concrete
  • Contractor Company: Bayburt Grup İnş. A.Ş.
  • Project Years: 2013-2014
  • Project type: Viaduct Project
  • Project location: Canik / Samsun
  • Ready-mixed concrete facility: Samsun and Çarşamba Ready-Mixed Concrete Facility
]]>